Stage 4: Technical Design
All design information required to manufacture and construct the project completed.
Undertake technical design, including Final Specifications, to manufacture and construct a fire safe building.
For fire engineering, it includes Detailed Design Fire Strategy Report and project support.
GBFE typical scope of works for Stage 4 Detailed Design Fire Strategy is as follows:
Review the design proposal
Identify areas that will not comply with the design recommendation and requirements of the Building Regulations
The Stage 4 Fire strategy report will be produced to include the fire design proposal on the basis that the design is finalised. The document to include the following topics;
B1 Means of warning and escape
B2 Internal fire spread (Linings)
B3 Internal fire spread (Structure)
B4 External fire spread, and
B5 Access and facilities for the fire service
Regulation 7 and Regulation 38
Advice to be provided to the Fire Strategy drawings
Fire strategy markups to cover compartmentation and means of escape
Support and relevant advice will be provided to the design team
Liaise with Building Control and Approving Authorities, where required
Fire safety review for the tender package
Review of product specification to assist the design team
* The number of Design reviews are based on the project and are subject to discussions with the client.
** The Fire Strategy Report will be reviewed externally by a qualified fire engineer.
*** Design team/statutory authority meetings are allowed for based on the project.